大风区铁路沿线挡风墙积沙机理及优化措施的风洞实验研究 1)
辛国伟,黄宁,张洁

WIND-TUNNEL EXPERIMENT ON SAND DEPOSITION MECHANISM AND OPTIMAL MEASURES OF WIND-BREAK WALL ALONG RAILWAY IN STRONG WIND AREA 1)
Xin Guowei,Huang Ning,Zhang Jie
图13 三类挡墙轨道线路上沙粒沉积率
Fig.13 The sand deposition rate of three kinds of three wind-break wall