大风区铁路沿线挡风墙积沙机理及优化措施的风洞实验研究 1) |
辛国伟,黄宁,张洁 |
WIND-TUNNEL EXPERIMENT ON SAND DEPOSITION MECHANISM AND OPTIMAL MEASURES OF WIND-BREAK WALL ALONG RAILWAY IN STRONG WIND AREA 1) |
Xin Guowei,Huang Ning,Zhang Jie |
图10 背风侧沿程沙粒水平速度变化($u_{* }=0.7749$m/s,$H=0.1$m) |
Fig.10 The sand particle horizontal speed along the leeward side ($u_{* }=0.7749$m/s,$H=0.1$m) |