SUBMARINE SLOPE STABILITY DURING DEPRESSURIZATION AND THERMAL STIMULATION HYDRATE PRODUCTION WITH HORIZONTAL WELLS 1)
Tan Lin,Liu Fang()
图15. 热激法不同注水温度开采30天后超孔压场与最危险滑裂面的位置
Fig. 15. The field of excess pore pressure and the position of potential slip surface after 30-day thermal stimulation with injected hot water of different temperatures