土遗址楠竹锚固界面传力过程研究
|
STUDY ON THE FORCE TRANSFER PROCESS OF THE ANCHORAGE INTERFACE OF BAMBOO BOLT IN THE RAMMED EARTH SITES
|
图7. 复合锚杆锚固系统加载端载荷-位移曲线试验值与理论值对比 |
Fig.7. Comparison of the load-displacement curve at loading end between the theoretical solutions and the experimental result (composite bolt anchorage system) |
![]() |