土遗址楠竹锚固界面传力过程研究
芦苇,赵冬,李东波,毛筱霏
STUDY ON THE FORCE TRANSFER PROCESS OF THE ANCHORAGE INTERFACE OF BAMBOO BOLT IN THE RAMMED EARTH SITES
Wei Lu,Dong Zhao,Dongbo Li,Xiaofei Mao

图6. 加载端载荷-位移曲线理论值与锚固长度为2 m和3 m试样(楠竹锚固系统)的试验值对比

Fig.6. Comparison of the load-displacement curve at loading end between the theoretical solutions and the specimens with the anchorage lengths of 2 m and 3 m (bamboo anchorage system)